HT2
Allentown Road
The HT2 Section of the project begins at this intersection. A through lane will be established on existing Wambold Road and a left turn lane will be established on Southbound Allentown Road. A shared use path will begin at this intersection and ADA compliant curb ramps and cross walks will be installed to connect this shared use path. Two Pedestrian refuge “Porkchop” islands will be created in addition to the existing one at this intersection. The existing traffic signal will be replaced with a four legged intersection traffic signal.